We follow a 6-step holistic process to bring the best product for our customer
➀ ➧
|
Planning and DesignAssess the project requirements and space dimensions.
Create a design plan for the gypsum system, including ceiling frames, partitions, or other structures.
|
Material Selection
Choose the appropriate gypsum boards, metal framing components, and accessories based on the design and application.
|
➁ ➧
|
➂ ➧
|
PreparationPrepare the site by cleaning and leveling the surfaces.
Mark the layout for the installation of frames and boards.
|
InstallationInstall the metal framing system (e.g., ceiling or partition frames) using screws and brackets.
Fix the gypsum boards onto the frames securely.
|
➃ ➧
|
➄ ➧
|
FinishingApply jointing compounds to seal gaps and joints between boards.
Sand the surface for a smooth finish.
Paint or decorate the gypsum surface as per the design.
|
Quality CheckInspect the installation for alignment, stability, and finish quality.
Make adjustments if necessary.
|
➅ ➧
|